Spring ISD – EP&I Center (GMP Package 01 – Site Development & Foundations)

GMP Package 01 for the Spring ISD - EP&I Center project includes the following scopes of work:
  • Concrete Foundations
  • Concrete Tilt Wall Panels
  • Concrete Paving
  • Anchor Bolts & Embeds
  • Parking Lot Lighting
  • Earthwork
  • Erosion & Sediment Control (SWPPP)
  • Paving Joint Sealants
  • Termite Control
  • Irrigation Sleeves
  • Site Utilities
The Education Performance and Instructional (EP&I) Center will be built on land owned by Spring ISD that currently houses the Planet Ford Stadium. This project will include an arena space that will be able to accommodate 5,000 people seated in bleachers and on the floor. This space will also be used for Athletics Competitions. In addition to the Arena, the Building will house a Performance Space to accommodate 1,000 people. This Performance space will be used for the Performing Arts band, choir, and theater performances. The project also includes, as an alternate, a multipurpose pavilion that has been designed to be versatile in its support of a host of activities and events in the district, including Marching Band practice, Underwater Robotics, Annual Spring Livestock Show, etc. The Pavilion can also host community or family celebrations including weddings and quinceañeras.

All bids must be submitted to: [email protected]

Estimator: Julian Ciarella

Estimated Start Date: April 1, 2025

Estimated End Date: April 1, 2027

Project Value: $105,000,000.00

Project Site: 23802 Cypresswood Drive, Spring, TX 77373

Bid: February 12, 2025 2:00 pm

Bid Type: CMAR