PLAN ROOM

PLAN ROOM

Anahuac Elementary, Middle and High School Alterations

The Work of this project includes construction to remodel an existing elementary school, middle school and high school. Work will include (but not limited to) the demolition of the existing entry canopy and replacement, new concrete drive and sidewalks, parking lot lighting replacement, painting existing building elements, selective demolition of existing construction, drywall partitions, security transaction window, scheduled finishes, bullet resistant paneling, acoustical ceilings, lighting, plumbing and mechanical systems. Estimated Project Value: $10,915,000; Estimated Start Date: 5/20/2024; Estimated End Date: 8/2/2024. *** Durotech, Inc. is CM @ Risk for this project. *** Date and Time for Pre-Bid Meeting: Monday, January 15, 2024 @ 10.00 AM; Location: 905 S Ross Sterling, Anahuac, Texas 77514.

Estimator

Sayali Chaudhari

Bid

January 31, 2024 2:00 PM

Files:

Addendum 1
Addendum 2
Addendum 3
Addendum 4
Drawings
Formal Addendum 5
Specifications

Back to projects

All form fields are required.





We Focus On Integrity