PLAN ROOM

PLAN ROOM

Deer Park HS South CTE Expansion Pkg. 02

For Final Pricing: Addition of a new 2-story building (62,239 SF) with additional classrooms and administrative spaces. New reconfigured surface parking drives, walking paths, new concessions and restroom building (1,200 SF) for Tennis facilities and new green areas. New 'white fleet' parking area for district vehicles. Renovation of a portion of the existing CTE programs and classrooms inside of the existing Deer Park HS South campus. Please send your pricing per the following breakdown: Base Bid: New CTE Building; Alternate No. 1: Central Plant Equipment Replacement; Alternate No. 2: Building Automation System Controls Upgrade; Alternate No. 3: Tennis Restrooms Building; Alternate No. 4: JROTC Renovation - Level 2 of existing HS; Alternate No. 5A: Food Science 1523 Renovation - Level 1 of existing HS; Alternate No. 5B: Interior Design 1534 Renovation - Level 1 of existing HS; Alternate No. 6: White Fleet Parking and Drive Paving; Alternate No. 7: Athletic Director's Office - Level 1 of existing HS. *** Durotech, Inc. is CM @ Risk for this project.*** Estimated Start Date: 7/18/2023; Estimated End Date: 8/14/2024.

Estimator

Julian Ciarella

Bid

June 08, 2023 2:00 PM

Files:

00 General
01 Civil
02 Landscape
03 Structural
04 Architectural
04.5 Roof and Flashing Details
05 Mechanical
06 Electrical
07 Technology
08 Fire Protection
09 Plumbing
10 Food Service
Specifications

Back to projects

All form fields are required.





We Focus On Integrity