This GMP Pricing is for Package 3 of the Aldine ISD W.W. Thorne Stadium project and consists of the following: 1) Structural Steel Fabrication & Erection; 2) Metal Railings; 3) MEP Equipment (Long Lead Time Equipment). *** Durotech, Inc. is CM @ Risk for this project. ***
Julian Ciarella
February 07, 2023 2:00 PM
Back to projects
All form fields are required.
Name
Email
Phone
Message