PLAN ROOM

PLAN ROOM

Aldine ISD WW Thorne Stadium Replacement Pkg 3

This GMP Pricing is for Package 3 of the Aldine ISD W.W. Thorne Stadium project and consists of the following: 1) Structural Steel Fabrication & Erection; 2) Metal Railings; 3) MEP Equipment (Long Lead Time Equipment). *** Durotech, Inc. is CM @ Risk for this project. ***

Estimator

Julian Ciarella

Bid

February 07, 2023 2:00 PM

Files:

Drawings
Specifications

Back to projects

All form fields are required.





We Focus On Integrity